| Aluminum 6061-T6 | Lightweight, corrosion-resistant, easy to machine, and widely available. Tensile strength is typically around 290 MPa. | Enclosures, brackets, fixtures, housings, prototypes, and structural components. | 5–10 business days | US$8–35 per part | 1–5 pieces | About ±0.05 mm standard; tighter tolerances may require additional inspection. | Good general-purpose choice when low weight, fast machining, and moderate cost are priorities. |
| Carbon Steel 1018 | Strong, economical, and easy to machine. Requires protective finishing for long-term corrosion resistance. | Machine bases, shafts, pins, brackets, tooling, and general industrial components. | 7–15 business days | US$12–45 per part | 1–10 pieces | About ±0.05 mm standard; surface finish and heat treatment can affect final dimensions. | Choose a supplier that can provide optional black oxide, zinc plating, or other corrosion protection. |
| Stainless Steel 304 | Excellent general corrosion resistance, good weldability, and moderate machinability. Work-hardens during cutting. | Food-processing equipment, medical hardware, outdoor parts, fittings, and chemical-service components. | 8–18 business days | US$18–60 per part | 1–10 pieces | About ±0.05–0.10 mm standard, depending on part size and geometry. | Confirm that the supplier has suitable tooling, coolant, and experience with work-hardening materials. |
| Brass C360 | Very good machinability, electrical conductivity, corrosion resistance, and attractive appearance. | Valves, connectors, electrical terminals, decorative hardware, and precision fittings. | 7–15 business days | US$15–55 per part | 1–10 pieces | About ±0.05 mm standard; small features may require dedicated tooling. | Verify the required alloy and confirm whether lead-free or regulatory-compliant material is needed. |
| Titanium Grade 5 | High strength-to-weight ratio, excellent corrosion resistance, and low thermal conductivity; difficult to machine. | Aerospace hardware, medical components, high-performance automotive parts, and chemical equipment. | 10–25 business days | US$45–150 per part | 1–5 pieces | About ±0.05–0.10 mm standard; critical features may require specialized inspection. | Prioritize suppliers with titanium machining experience, rigid equipment, and documented tool-life control. |
| Tool Steel O1 or A2 | High hardness and wear resistance after heat treatment; more demanding to machine than mild steel. | Dies, punches, gauges, molds, wear plates, and production tooling. | 12–30 business days | US$30–120 per part | 1–5 pieces | About ±0.03–0.08 mm before heat treatment; post-treatment grinding may be required. | Ask whether heat treatment, stress relief, grinding, and hardness certification are available in-house or through qualified partners. |
| Copper C110 | Excellent electrical and thermal conductivity but relatively soft and prone to burr formation during machining. | Busbars, electrical contacts, heat-transfer components, and conductive fixtures. | 8–18 business days | US$20–75 per part | 1–10 pieces | About ±0.05–0.10 mm standard, depending on feature size and burr-control requirements. | Choose a supplier experienced in chip control, deburring, and protecting cosmetic or conductive surfaces. |